The River Looking North
null
The Road Looking South
null
The Land Stripped Of Vegetation
null
The Building Marked Out
Ping View
null
The Building Marked Out
null
A Delivery Of Rebar
null
One Inch Deformed
null
The Piling Rig
map
null
Steel Cutting And Bending Machines
null
Some Piles
null
The Piling Rig Winch
null
Repairing The Piling Rig
profile
null
Piles Driven To A Few Inches Below The Surface
null
Bending Rebar
null
Rebar For The Footings
null
Some Piles Driven And Some Waiting
satelite
null
Driving A Pile
The Hammer And The Hat
The Hammer
Piles Nearly Driven
Excavating Around The Piles
null
Excavating Around The Piles
Excavated To The Depth Of The Footings
Excavated To The Depth Of The Footings
Excavation Floor Leveled
Excavating A Path To The Main Sewer
null
Drilling Into The Sewer
Three Sewer Pipes
Concreting Sewer Pipes
Concreting Sewer Pipes
Backfilling Sewer Excavation
null
Finished At Night
Sewer Valves
Pile Heads
Jack Hammering The Pile Heads
Jack Hammering The Pile Heads
null
Jack Hammering The Pile Heads
Jack Hammering The Pile Heads
Jack Hammering The Pile Heads And Leaving The Rebar
Pile Head Cut To Depth
Pile Heads Cut To Depth
null
Rebar Prepared For Lift Footing
Pouring And Vibrating The Lift Footing
Pouring And Vibrating The Lift Footing
Preparing Rebar For Footing
Rebar For Footing
null
Delivery Of Plastic Backed Plywood
Delivery Of Plastic Backed Plywood
Preparing Rebar For Footing
Preparing Rebar For Footing
Preparing Rebar For Footing
null
Pouring The Lift Pit
Lift Pit Form And Bracing
Lowering Rebar For Footings On Pile Heads
Lowering Rebar For Footings On Pile Heads
Lowering Rebar For Footings On Pile Heads
null
Lowering Rebar For Footings On Pile Heads
The River Looking North At Low Water
Rebar For Central Column
The Lift Pit Sealed With Epoxy
Eucalyptus Wood
null
Rebar For Column Lowered Into Rebar For Footing
Rebar For Column Hanging From Crane
Rebar For Column Lowered Into Rebar For Footing
Rebar For Column Hanging From Crane
Bracing Rebar For Column
null
River Looking North To Weir
Excavating The Banks Of The River For Backfill
Bracing Rebar For Column
All Rebar Placed For Foundations
All Rebar Placed For Foundations
null
Tying The Column Rebar To The Footing Rebar
Cutting Off Surplus Rebar From Pile Heads
Preparing Form For Footing
Welding Form Bracing For Footing
Form Prepared For Footings
null
Form Prepared For Foundation Columns
The Concrete Pump
Pouring The Foundations
Pouring The Foundations
Pouring The Foundations
null
Pouring The Foundations
Five Meters Per Truck
One Footing Poured
Troweling One Footing
Footing With Surface Troweled
null
Footings With Surface Troweled
Footing Curing
Pouring Foundation Columns
The Foundations Poured
Foundation Column Poured
null
The Foundations Poured
The Foundations Poured
Backfilling The Foundations
Backfilling The Foundations
Backfilling The Foundations
null
Delivery Of Eucalyptus Wood
Foundations Nearly Backfilled
Backfilling The Foundations
Backfilling The Foundations
The River Looking North
null
Backfilling The Foundations
Backfilling The Foundations
The Foundations Backfilled
Cutting Steel For The Column Braces
Cutting Steel For The Column Braces
null
Steel Cut For The Column Braces
Pipe Work
Pipe Work
Pipe Work
Pipe Work
null
Welding Column Braces
Marked Out For Split Level
Leveling The Ground
Bricking Edges For The Second Level
Laser Level
null
Edges Bricked For The Second Level
Seventy Tones Of Rebar
Rebar On Flatbed Truck
Rebar Lifted Close To Warehouse
Split Leveled
null
Placing The Rebar For The Floor
Rebar For Drop Beam
Rebar Around Pipe
Floor Rebar
Floor Rebar
null
Floor Rebar
Pouring The Ground Floor
The Crane
Pouring The Ground Floor
The Bucket
null
Pouring The Ground Floor
Pouring The Ground Floor
Pouring The Ground Floor
The Vibrator Motors
Vibrating The Floor
null
Tamping The Floor
The Ground Floor Poured
Power Troweling The Ground Floor
Power Troweling The Ground Floor Through The Night
Hand Troweling The Ground Floor Through The Night
null
Power Troweling The Ground Floor
Burlap For Curing
Planing The Column Form
The Column Form
The Ground Floor
null
Doi Suthep
Form Erected For The Ground Floor Columns
Form Erected For The Ground Floor Columns
Form Erected For The Ground Floor Lift Columns
Form Erected For The Ground Floor Fire Staircase
null
The River Bank Looking North
The Crane For Pouring The Ground Floor Columns
Slump Test
Inside The Main Staircase Slab
Laser Level
null
Loading The Manned Bucket
Flying With The Bucket
Flying With The Bucket
Loading The Bucket
Pouring A Column
null
Feeding The Funnel Tube Into The Column Form
Feeding The Funnel Tube Into The Column Form
Pouring The Column
Pouring The Column
Pouring The Staircase
null
Pouring The Column
Wat Padet And Doi Suthep
Watering The Columns
Columns Wrapped In Plastic
Columns Wrapped In Plastic
null
Hammer Testing The Slab
The Ground Floor Main Staircase
Wrapping A Column
The Ground Floor Columns
Props For The Second Floor
null
Props For The Second Floor
Second Floor Form
Props For The Second Floor
Second Floor Form
Props For The Second Floor
null
Second Floor Form With Drop Level
All Rebar Is Hooked
Drop Beam Laterals
Second Floor Rebar
Rebar Around Pipe
null
Rebar Around Service Hatch
Lapped And Hooked
Second Floor Rebar
Filling The Bucket
Filling The Bucket
null
The Bucket
Pouring The Second Floor
Waiting For A Bucket
Pouring The Second Floor
Pouring The Second Floor
null
Pouring The Second Floor
Vibrating The Floor
The Crane
Power Trowelers
The Second Floor Partly Troweled
null
Power Troweling The Second Floor
The Second Floor Partly Troweled
Power Troweling The Second Floor
Hand Troweling The Second Floor
Planted On The Bank
null
From The Road
Breakfast
Power Troweling The Second Floor
Burlap Sacks For Curing
Watering The Second Floor
null
Curing The Second Floor
Lapping Rebar For The Second Floor Columns
The Lift Shaft
Lapping Rebar For The Second Floor Columns
Rebar And Form For The Second Floor Columns
null
Props For The Staircase
Form For The Second Floor Columns
Form For The Second Floor Columns
Two Welding Kits In The Doghouse
Rebar For The Main Staircase
null
Second Floor Column Rebar
Coming Down To Earth
The Flying Machine
Waiting For The Bucket And Funnel
Pouring A Column
null
Pouring The Staircase
Column Half Poured
The Crane
Pouring A Second Floor Column
Cloud Coming From The Mountain
null
Pouring The Second Floor Columns In Heavy Rain
Wet
Taking The Form Off A Column
A Column
Lift Columns
null
Second Floor Columns
Wooden Tower Lift Foundations
Mosquito Spray
Mosquito Spray
Wat Padet And Clouds Over The Mountain
null
First And Second Floor Columns
First Stage Wooden Tower Lift Columns
Second Floor Drop Beams From Below After Form Removed
Second Floor Drop Beams From Below After Form Removed
First Floor Lift Shaft
null
Operational First Stage Wooden Tower Lift
Wooden Tower Lift
Props For The Third Floor
Props For The Third Floor
Props For The Third Floor
null
Doi Suthep And Wat Padet
The River Looking North Through The Electricity Cables
Third Floor Form
Fitting The Form Around A Column
A Drain Close To A Column
null
Floor Rebar Hooked At One Hundred And Thirty Five Degrees
Thrid Floor Form And Second Floor Drop Beams
Tying Third Floor Rebar
Tying Third Floor Rebar
Hammering Edge Form
null
Afternoon Clouds
Reducing Column Form Width
Third Floor Ready For Pouring
Soaking Up Rain Water From The Floor Form
From The River Bank
null
Expansive Concrete
Pumping The Third Floor
Pouring The Third Floor
Pumping And Vibrating
Pumping The Third Floor
null
The Lone Ranger Tamping The Third Floor
Laser Level
Cube Test Samples
Troweling The Third Floor
The Third Floor After A Cloud Burst During Troweling
null
Hand Troweling The Third Floor
Hand Troweling The Third Floor
Column Rebar
Lift Column Corner Laterals
Lapping Column Rebar
null
Third Floor Column Form And Wooden Tower Lift
Crane And Bucket
Crane And Bucket Poring Third Floor Columns
Crane And Bucket Poring Third Floor Columns
Bucket Funnel Tube And Jockey
null
Pouring The Third Floor Columns
Pouring The Third Floor Columns
Pouring The Third Floor Columns
Third Floor Drop Beams From Below With Form Partially Removed
Removing Form From A Column
null
Watering A Column
Wooden Tower Lift Extended To The Forth Floor
Spiral Staircase In The Wooden Tower Lift Columns
Props For The Forth Floor Above Second And Third Floor Slabs
Leveling Props For The Forth Floor
null
Form For The Lift Shaft Shear Walls
Bending Septagons For Pipe Duct Reinforcement
Bracing Props For The Forth Floor
Form For The Forth Floor And Doi Suthep
The River Looking North
null
Column Rebar
Forth Floor Ready To Pour
Forth Floor Ready To Pour
Forth Floor Ready To Pour
Tricycle For Hire
null
Concrete Pump
Pumping Concrete
Concrete Pump Arm Over The Forth Floor
Pumping And Vibrating The Forth Floor
Pumping And Vibrating The Forth Floor
null
Vibrating The Forth Floor
Tamping The Forth Floor
The Forth Floor During Troweling
Power Troweling The Forth Floor As The Sun Sets Behind Doi Suthep
Power Troweling The Forth Floor
null
Power Troweling The Forth Floor
Watering The Forth Floor
White Aggregate Tailings
Sieving And Grading White Aggregate Tailings
White Aggregate Tailings Sieved And Graded
null
Forth Floor Column Ready To Be Poured
Wood Fortified Steel Bracing For Floor Joint Of Staircase
Delivery Of Ready Mix
Pouring A Column
Pouring Columns
null
The Crane Not Quite Reaching The Furthest Columns
Pouring The Staircase
Doi Suthep
The Bucket Jockey With Two Hats
The Bucket Passing The Mountain
null
Forth Floor Columns Wrapped In Plastic
Props For The Fifth Floor
Erecting Props For The Fifth Floor
The River Looking South
The River Looking North
null
Pumping And Vibrating The Fifth Floor
Pumping And Vibrating The Fifth Floor
Tamping The Fifth Floor
Tamping The Fifth Floor
Hand Troweling The Fifth Floor
null
Power Troweling The Fifth Floor
Power Troweling The Fifth Floor
Power Troweling The Fifth Floor
The Fifth Floor Poured
Covering The Fifth Floor With Burlap
null
Watering The Fifth Floor In The Light Of A Rainbow
Sunset
Welding Staircase Form Bracing
Preparing Form For The Sixth And Seventh Floor Cantilever
Fifth Floor Column Form And Bracing
null
Fifth Floor Column Form With Rebar Extending To be Lapped Into Sixth Floor Fin
Looking South From Up Stream
Fifth Floor Columns Ready For Pouring
Loading The Bucket
Telescopic Boom Extension
null
Bucket In Mid Air
Reaching For The Bucket
Pouring And Vibrating A Column
Pouring A Column
Lunch
null
Pouring And Vibrating A Lift Shaft Corner Column
Pouring The Staircase Mouth
Staircase Mouth Poured
Flying Above Chiang Mai
Form Prepared For The Sixth Floor As An Oblique Tier
null
Counting Granite
Polished Surface Of Granite
The Pump Arm
Pumping And Vibrating The Sixth Floor
Tamping On The Edge
null
The Sixth Floor Poured
Contemplating The Sixth Floor
Power Troweling The Sixth Floor
The Sixth Floor Surface After Power Troweling
The Fifth Floor Balcony One Tier In From The Forth Floor
null
Rebar For The Six Floor Fin With A Continuous Spiral Lateral
Erecting Form For The Sixth Floor Fin
Preparing Rebar For The Sixth Floor Cantilever
Form And Bracing For The Sixth Floor Cantilever
Form And Bracing For The Last Stage Main Staircase - With Extra Bracing - And Some More
null
The First Six Floors With The Form Ready For The Sixth Floor Columns And The Wooden Tower Lift
Form For The Sixth Floor Columns And Main Staircase
Multicoloured Flying Machine
Flying Above The Sixth Floor
Form For The Sixth Floor Columns Stairs And Cantilever
null
The River And Road Looking South
Looking North Forty Seven Meters Above Land
Pouring The Sixth Floor Cantilever
Pouring A Sixth Floor Column
The Bucket And Jockey
null
Leveling A Column
Removing Form From The Sixth Floor Fin
The First Row Of Props For The Seventh Floor
Removing Form From The Sixth Floor Cantilever
The Sixth Floor Slab Cantilever And Form Bracing
null
Pumping And Vibrating The Seventh Floor
Pumping And Vibrating The Seventh Floor
Tamping And Leveling The Seventh Floor
Pouring The Seventh Floor
Cloud Burst
null
Power Trowler Sitting On The Seventh Floor After A Cloud Burst
Draining Rainwater Off The Seventh Floor While Power Troweling
The Seventh Floor Partly Troweled
Power Troweling The Seventh Floor
Planting A Tree On The River Bank
null
Crane Hand Sitting On The Job
Flying Above Rebar
Pouring The Seventh Floor Cantilever
Pouring A Seventh Floor Column
Seventh Floor Columns
null
Rebar For Seventh Floor Foam Topping
Seventh Floor Columns And Cantilever With Floor Prepared For Foam Topping
Foam Concrete Slump
Pouring Seventh Floor Foam Topping
Bucket Jockey Eaten Alive
null
Tower Crane Up Thirty Meters
Loy Kratong Festival From The Sixth Floor
Twenty Thousand Litres Of Septic Tank
Rebar Prepared For The Roof Deck
Pouring And Vibrating The Roof Deck
null
Pouring And Vibrating The Roof Deck
Pouring And Vibrating The Roof Deck
Pouring The Roof Deck
Pouring And Vibrating The Roof Deck
Power Troweling The Roof Deck
null
The Roof Deck Covered With Burlap
The Lift Shaft
Cleaning Up Form From The Roof Deck Drop Beams
Moving Earth Back And Forth
Piles For Swimming Pool And Retaining Wall
null
Rebar For Steps On Main Staircase
Drop Beams
Rebar For The Lift Room Ceiling
Preparing Level For The Sloping Roof Deck Topping
First Pile To Support The Roadway Above The Septic Tanks
null
Piles To Support The Roadway Above The Septic Tanks
Rebar For Septic Tanks Base
Piles To Support The Roadway Above The Septic Tanks And Concrete Base For Tanks
Piles For The Rear Retaining Wall
A Mountain Of Excavated Earth
null
A Small Pile Driver
Piles And Panels For The Rear Retaining Wall
Four Septic Tanks In Place
Pouring And Vibrating The Rear Retaining Wall
Holding The Bucket
null
Pouring The Lift Room Ceiling
Pouring And Vibrating The Lift Room Ceiling
Pouring And Vibrating The Roof Deck Crown Topping
Twelve Thousand Litres
The Right Hand Side Retaining Wall
null
The Land Marked Out For The Swimming Pool Piles
The Rear Retaining Wall Poured With Rebar Extending For The Shear Wall
The Rear Retaining Wall And Shear Wall And The Swimming Pool Pile Heads
About To Get Crushed With A Giant Bucket
Form And Rebar For The Left Hand Side Retaining Wall
null
Leveling - Or Evenly Sloping - The Ground For The Swimming Pool
The Left Hand Side Retaining Wall Beam
The Left Hand Side Wall Beam
Water Tanks On The Lift Room Ceiling Slab Poured Obliquely On The Lift Shaft Columns
The River Looking North At Low Water
null
Backfill Graded To The Level Of The Rear And Left Retaining Walls
Swimming Pool Rebar
Swimming Pool Rebar
Swimming Pool Rebar Congestion
Final Ties To The Swimming Pool Rebar
null
Final Ties To The Swimming Pool Rebar
Pouring Vibrating And Laser Sloping The Swimming Pool Base
Pouring And Vibrating The Swimming Pool Base
Vibrating Through Five Layers Of Rebar in Pairs
Laser Sloping And Tamping The Swimming Pool Base
null
Hand Troweling The Swimming Pool Base
Bricking Up The Left Wall
Swimming Pool Interior Form
Swimming Pool Inlets And Rebar
Inside The Swimming Pool Overflow Bracing The Form With Stainless Steel Wire
null
Swimming Pool Rebar And Form Braced With Stainless Steel Wire
Swimming Pool Internal Form Bracing
You Can Never Have Too Much Internal Form Bracing
Swimming Pool Braced And Ready To Pour
Waste Water Joints
null
Rear Rainwater Pipes
Pouring And Vibrating The Swimming Pool Walls
Pouring And Vibrating The Swimming Pool Walls
The Swimming Pool Deck Poured
Hand Troweling The Swimming Pool Deck
null
Hand Troweling The Swimming Pool Rim And Deck
Painting Liquid Epoxy In The Swimming Pool Interior Base Joint
Painting Liquid Epoxy In The Swimming Pool Exterior Base Joint Under The Deck
Backfilling Under The Swimming Pool Deck
Backfill Under The Swimming Pool Deck
null
Grading The Car Park And Backfilling Under The Swimming Pool Deck
Grading The Car Park And Backfilling Under The Swimming Pool Deck
Swimming Pool Water Inlet
Storeroom Rebar
Backfilling The Left Hand Drive
null
Rebar For The Storeroom Ground Floor
Dragging A Cement Mixer
Local Mixing Station With Admixtures
Pipework And Rebar For Beams To Support The Roadway Above The Septic Tanks
Pipework And Rebar For Beams To Support The Roadway Above The Septic Tanks
null
Pipework And Rebar For Beams To Support The Roadway Above The Septic Tanks
Pouring And Vibrating The Beams To Support The Roadway Above The Septic Tanks
Pouring And Vibrating The Beams To Support The Roadway Above The Septic Tanks
Storm Drain Pipes
Retaining Wall At Front Of Swimming Pool
null
Beams To Support The Roadway Above The Septic Tanks
Beams To Support The Roadway Above The Septic Tanks
Storm Drains Between The Swimming Pool And The Right Hand Retaining Wall
Rendering A Tight Manhole
Delivery Of Breeze Blocks
null
From The Communal Garden Opposite
Micro Excavator Bedding In Short Piles
Leveling The Ground For The Front Storm Drains And Reservoir
The Front Storm Drains And Reservoir
Storm Drains And Manhole
null
Poring Beams At The Front Roadway
Pouring The Beam On The Top Of The Left Hand Wall
Bricking Up The Swimming Pool Car Park Divide
Finishing Off A Manhole Cover
Manhole Cover In Place
null
Bricking Up The Swimming Pool Perimeter
Pouring The Store Room Second Floor By Hand
Pouring The Store Room Second Floor Columns
Pouring And Vibrating The Swimming Pool Deck Above The Service Route
Leveling The Right Hand Driveway With Rough Concrete
null
Partly Done Test Render With White Cement And Aggregate With Coloured Pigments
Test Rendering White Cement And Aggregate With Coloured Pigments
Extra Rebar Around Manhole Corners
Sunblock And Rebar
Form For Manhole Covers
null
Form And Rebar For Manhole Cover
Pouring A Manhole Cover
Pouring And Vibrating A Manhole Cover
A Manhole Cover Poured
Tamping Around A Manhole Cover
null
In The Chute
Moving Wet Cement Around
Ankle Deep In Wet Cement
The Right Hand Drive Poured
Power Troweling The Right Hand And Front Drive
null
Waste Water Pipework
Teak Log Stripped Of Bark And Partly Sealed
Sealing A Teak Log
Clay Roof Tiles
Looking South West On A Rainy Season Afternoon
null
Looking East To Doi Suthep On A Rainy Season Afternoon
Looking North Across The City On A Rainy Season Afternoon
Looking East Across The River
Looking South East
Mixing Lightweight Expanded Polystyrene Concrete
null
Partly Poured Lightweight Expanded Polystyrene Concrete Floor Topping
Pigments Labeled In English Thai Shan Hilltribe And With Icons
Mixing Test Colour Renders
The Rear Wall Used As A Colour Workshop
Combing Glue Cement On The Underside Of The Main Staircase
null
Glue Cement Combed On The Shear Surface Of One Of The Columns
The Storeroom Roof Ready To Be Tiled
Customising Wheel Barrows
Wheel Barrow Customised To Carry Cement And Be Hoisted
Anchoring The Teak Log On The Roof Deck
null
Bracing The Teak Log From One Of The Water Tank Room Columns
Attaching The Lightning Conductor To The Teak Log
Tiling The Storeroom Roof
Filling The Bare Swimming Pool
Form For The Window Bearing Non Structural Sixth And Seventh Floor Columns
null
Form For The Window Bearing Non Structural Sixth And Seventh Floor Columns
Pouring A Window Bearing Non Structural Fifth Floor Column
Pouring The Internal Non Structural Fifth Floor Columns
Imported Concrete Pigments
Electrical Conduit Piping
null
Transformer Pylons
Seventh Floor Electrical Conduits
Rebar For The Rear Drive
Pouring And Vibrating The Rear Drive
Lunch
null
Scaffolding
Triangular Faceted Scaffolding
Scaffolded And Clad
Sealing Form For Non Structural Column
Bricking Up The Seventh Floor
null
Pouring A Path Over The Roof Deck Water Mains Out Of The Partly Rendered Water Tank House
Storm Obscuring The Mountain
Storm Brewing Behind The Mountain
Seventh Floor Bricked Up
The Water Tank House Rendered In Two Tones
null
The Service Route Access Houses Rendered In Two Tones
Rendering The Roof Deck Rim In Coloured Cement
Rendering The Roof Deck Rim In Coloured Cement
Teak Wall Tiles
Extractor Fans
null
Sealing The Roof Deck With APP Bitumen
Clouds Over The River
Squaring The Edges On The Floor Drop Panels
Seventh Down To The Second Floor Mostly Bricked Up
Seventh Down To The Second Floor Mostly Bricked Up
null
String And High Voltage Electricity Cables
Shan Worker Gets Married
Double Sealing The Roof Deck Perimeter With APP Bitumen
Sealing The Coloured Render On The Roof Deck
Squaring The Edges On A Seventh Floor Window
null
The Roof Deck Rim In Coloured Cement With Surface Sealed
Squaring The Edges On A Fifth Floor Column
The River Looking North At Low Water
Beginning To Render The North Side In Coloured Cement
Rendering A Window Frame And Molding In Coloured Cement
null
Rendering The North Side In Coloured Cement
Rendering The North Side With The Previous Day's Coloured Render Covered In Plastic
Troweling The Coloured Render
The North Side Rendered In Coloured Cement
The North Side And Front Rendered In Coloured Cement
null
From The River At Low Water
Timber For The Stairs
The Rear With The Render In Coloured Cement Nearly Complete
Timber For The Stairs Routed and Sanded
Balcony Ceiling Tiled And Primed
null
Balcony Ceiling Tiled And Painted
Swimming Pool Toilet Roof Tiled With Terracotta And Red Grout
Television Cable Wiring Negotiating Corners
Argon Welding The Roof Garden Railings
The Roof Garden Stainless Steel Railings
null
Disassembling The Eucalyptus Wood Scaffolding
Installing The Satellite Dish
Tiered Conduits For Television And Network Cables
Disassembling The Eucalyptus Wood Scaffolding
Disassembling The Scaffolding Below Stainless Steel Railings
null
The North Side With The Scaffolding Partly Disassembled
Extractor Fan Ducts And Mains Electricity Conduits
From The South
Edge Of Balcony On Seventh Floor Tiled With Terracotta And Red Grout
Delivery Of Large Flower Pot
null
Delivery Of Small Flower Pots
Mixing Coloured Cement
Pouring Trays For Large Flower Pots With Coloured Cement
Pouring Trays For Large Flower Pots With Coloured Cement
Small Flower Pot Trays
null
Preparing To Lift A Large Flower Pot Tray
Lifting A Large Flower Pot Tray
Receiving A Large Flower Pot Tray On The Roof Deck
Positioning A Large Flower Pot Tray
Large Flower Pots And Trays Ready To Be Lifted
null
Lifting A Large Flower Pot Tray
Lifting A Large Flower Pot Tray
Lifting A Large Flower Pot Tray
Small Flower Pots Ready To Be Lifted
Receiving Small Flower Pots Tray On The Roof Deck
null
Flower Pots Filled With Soil
Lifting Flower Pots And Soil
Lifting Trees
Receiving Climbing Plants On The Roof Deck
Planting Trees In The Large Flower Pots
null
More Shrubs Arriving On The Roof Deck
Planting Shrubs
Shrubs On The Roof Deck
Shrubs On The Roof Deck
More Plants Arriving On The Roof Deck
null
Plants On The Roof Deck
Plants On The Roof Deck
Tree On The Roof Deck
Rainstorm Over The Mountain
Grouting Terracotta Tiles On The Seventh Floor Front Balcony
null
Sealed Terracotta Tiles On The Edge Of The Seventh Floor In The Rain
On A Sunny Morning
Wet Cutting Granite
Wet Coring Granite
Laying Granite On The Sixth Floor
null
Placing The Base Of The Seventh Floor Fixed Pane Window
Curing The Textured Yellow Cement Bathroom Floor
From The Inundated Weir At High Water
Seventh Floor Balcony Tiled With Terracotta
Tiling The Balcony Rims With Terracotta
null
Tiling The Balcony Rims With Terracotta
Template For Roof Garden Spiral Staircase
Welding The Roof Garden Spiral Staircase
Cleaning The Roof Garden Spiral Staircase
Laminated And Tempered Green Glass
null
Laminated And Tempered Green Glass
Laminated And Tempered Green Glass
Keeping The Headache Away
Laminated And Tempered Green Glass
Laminated And Tempered Green Glass
null
Delivery Of Fine Sand
Cutting The Concrete Driveway Close To The Road
Jack Hammering The Driveway Close To The Road
Tiling The Seventh Floor Lift Façade
Tiered Terracotta Balconies Overlooking The River
null
Pouring A Textured Yellow Cement Bathroom Floor
Tiling Second Floor Terracotta Balcony
Preparing One Of The Fifth Floor Wooden Steps
The Seventh Floor Staircase Finished In Wood And Marble and Covered In Plastic Film
Teak Wall Tiles
null
Adhesive For Teak Wall Tiles
Retouching Ceiling Paint By Teak Wall Tiles On Drop Beams
Aluminium Window Sections
Fins For Seventh Floor Frameless Windows
Stainless Steel Door Handles Wrapped In Plastic Film
null
Aluminium Ceiling Fan Wrapped In Plastic Film
Tiling The Sixth Floor Lift Façade
Hollow Core Will Be The Base For The Main Distribution Box
Sliding Laminated Green Safety Glass Windows On The Sixth And Seventh Floors
Sliding Windows On The Sixth And Seventh Floors And Framless Glass On Forth To Seventh Floors
null
Large Sliding Windows Set With View Of Wat Padet
Wide Sliding Windows Set With View Of The City
Sliding Windows Set And Framless Floor To Ceiling Glass
<i>I fought the law and the law won.</i>
Rather Dusty Mains Electricity Cable
null
Cutting The Corner Off A Granite Counter Top
Granite Counter Tops
Mixing Blue Concrete
Bathroom Floor Finished In Blue Concrete
Standing In Mid Air
null
Not Sure What He Did To His Face
Fixing Picture Hooks
Profiled Rebar In One Of The Fish Tank Stands
Mixing Concrete With Granite
Pouring One Of The Fish Tank Stands With Granite Concrete
null
Screeding One Of The Fish Tank Stands
Screeding One Of The Fish Tank Stands
One Of The Fish Tank Stands Curing
Internal Partitions On The First Floor
Beam Poured For The Gas Tank Alcove
null
Gas Tank Alcove
Large Doorframe For The Reception Suite
Moving One Of The Ground Floor Water Tanks
Ground Floor Water Tanks And Carbon Filter
Fire Hose And Hydrant Pipe
null
Delivering The Master Distribution Box
Inside The Master Distribution Box
The Master Distribution Box
Five Tonnes Of Cement On A Fish Tank Stand
A Tight Fit
null
Brass Inlet Valves
Rendering The Outside Wall
Rendering The Outside Wall
Handing Up The Stainless Steel Railings
Partly Erected Seventh Floor Balcony Stainless Steel Railings
null
Mixed Hard Wood Wall Tiles
Six Hundred And Thirty KVa
Sitting Comfortably
Terracotta Edging Around Windows
Drilling The Cable Ladder
null
Connecting The Electricity Mains
The Electricity Board Does Not Pour Concrete Like This
Cable Ladder
Cable Ladder With Cables
Three Phases And Neutral
null
Dissembling The Wooden Tower Lift
Hardwood Beam Being Reused Above Main Entrance
Granite For Counter Tops
Stairs Finished In Teak And Marble
Air Conditioner Compressor
null
After A Cloudburst
Assembling The Lift Car
Walking The Plank
Checking The Diagonals For Square Corners
Swimming Pool Full Of Muck
null
Jet Washing The Swimming Pool
Scrubbing The Swimming Pool
The Swimming Pool Marked Out
Granite Coping Stones
Finishing The Granite Coping
null
Level Overflow
Tiling The Swimming Pool Wall
Rendering The Swimming Pool Area Wall In Cream Cement
Terracotta Tiles On The Storeroom End Of The Swimming Pool
Cambodian Friezes
null
Assembling A Cambodian Frieze
Troweling Cement Affectionately
Swimming Pool Steps
Tiling The Swimming Pool Floor
Tiling The Swimming Pool Floor
null
The Swimming Pool
The Land To Become The Car Park
Clearing Rubble From The Car Park
Clearing Rubble From The Car Park
Clearing Rubble From The Car Park
null
Grading The Car Park
Deformed Wire Mesh
The Car Park Prepared For Pouring
Pouring And Vibrating The Car Park
Power Troweling The Car Park
null
Burmese Girls
Curing The Car Park
Stainless Steel Banisters
Stainless Steel Shelve Brackets
Welding Stainless Steel
null
Bathroom Corner Counter
Bathroom Counter
Stainless Steel Railing And View From Second Floor
Stainless Steel Air Conditioner Stand
Stainless Steel Weld
null
Granite Grouted With Polyurethane
Granite Boxes
One Of The Fish Tank Stands In The Reception Suite
Marble
Marble
null
Ground Floor Lift Façade
Grouting The Kitchen Tiles
Extractor Fan And Wooden Truss
LED Emergency Light
Raised Toilet And Yellow Concrete Floor
null
Alcove For Gas Bottles With Rubber Floor
Dressing The Sports Room Ceiling With Glue Cement
Making The Edges On The Exterior Wall
One Of The Air Pumps For Oxygenating The Septic System
Aluminium Façade For Spetic System Air Pump Room
null
Ceiling Fittings With Protective Foam
Metallic Blue Wall Interior Wall Paint
Wood Façade For Spetic System Air Pump Room
Sink On A Granite Corner Counter
Mix Tap And Drinking Water Tap On Stainless Steel Sink Wrapped In Film
null
Preparing The False Ceiling For The Kitchen
Steps Up To The SWimming Pool Entrance
Putting Marble On The Reception Suite Ceiling
Exterior Driveway Columns Tiled In Terracotta
Tiling The Reception Suite Columns
null
The Reception Suite Columns Tiled And Sealed
Polishing The Reception Suite Marble Ceiling
The Great Wall Of China
Handmade Terracotta Tiles
Handmade Terracotta Tiles On One Of The Façade Columns
null
Planing One Of The Reception Suite Doors
Schedule Ten
Bolting The Stainless Steel Gate Frame Into Concrete
Carefully Painting The Reception Suite
Wardrobes Revived With Metallic Paint
null
Cutting Up Perfectly Good Pieces Of Teak
When It Is In The Lift You Will Understand
Teak Wardrobe
Making A Bed
Equal Spacing Is Not So Obvious
null
Topsoil On The Verge
Garden Planted On The Verge
Lift Façade
Lift Interior With Corner Bench
First Floor Kitchen
null
Service Hatch
Lifting Up One Way Laminated Tempered Glass
One Way Glass From The Inside
Dining Tables Made From Granite Counters And Hardwood
The Reception Suite Doors
null

  Machines        Cranes & Vehicles        Piles        Foundations        Pipe & Waterworks        Rebar        Formwork        Wet Cement        Curing        Concrete        Testing        Tower Lift & Scaffold        Through The Night        Supplies        Secondary Structure        Swimming Pool        Utilities        Dressing & Rendering        Roof Garden        Scenery        Oops        Miscellaneous          Everything        

Oops!
null
The First Pour Of The Lift Pit Before It Went Wrong
null
The Cinder Block Form For The Lift Pit Turned To Mashed Potato
null
Four Meters Of Self Compacting Concrete Slip Out Into The Foundation Groundwork
null
The Second Pour Of The Lift Pit Before It Went Wrong
null
A Bad Batch Of Concrete
null
A Bad Batch Of Concrete
null
A Bad Batch Of Concrete
null
Jack Hammering Out The Lift Pit
null
Jack Hammering Out The Lift Pit
null
Jack Hammering Out The Lift Pit
null
null
Jack Hammering Out The Lift Pit
null
Jack Hammering Out The Lift Pit
null
Jack Hammering Out The Lift Pit
null
Jack Hammering Out The Lift Pit
null
The Form For The Third Pour Of The Lift Pit Leaks
null
A Bad Delivery Of Ten Mil Deform
null
A Bad Delivery Of Ten Mil Deform
null
The Concrete Was Good But The Truck Was A Bit Old
null
The Concrete Was Good But The Truck Was A Bit Old
null
The Ground Floor Main Staircase Form Leaked
null
null
Not All The Concrete From The Bucket Went Into The Funnel
null
A Void In The Column Below A Chair And Down To The Rebar Where The Self Compacting Concrete Did Not Self Compact
null
Soaking Up Rainwater After A Cloud Burst During Troweling
null
Sack Of Pigment Ruptured in Transit
null
Sack Of Pigment Ruptured in Transit
null
Hairline Crack On The Underside Of The Main Staircase Slab Where Props Were Removed Too Early
null
Cutting The Seconday Staircase
null
Jack Hammering Out The Main Staircase
null
Jack Hammering Out The Main Staircase
null
Cutting The Main Staircase
null
null
Cutting The Main Staircase
null
Cutting The Main Staircase
null
Adding Wire Mesh To The Secondary Staircase To Be Repaired
null
Self Compacting High Strength Expansive Grout
null
Pouring The Main Staircase
null
The Main Staircase Form After Repair
null
The Seventh Floor After A Cloud Burst While Finishing
null
Pouring A Test Foam Concrete Shear Wall
null
Test Foam Concrete Shear Wall Form Buckled
null
Drilling A Core Where A Drainpipe Was Omitted
null
null
Foam Concrete Topping On Seventh Floor Did Not Adhere To Slab
null
Tank Track Slipped Off The Excavator
null
Lowering The Output On One Of The Septic Tanks After The Excavator Walked Too Close
null
Lowering The Output On One Of The Septic Tanks After The Excavator Walked Too Close
null
Not Satisfied With The Slop For Rendering
null
White Aggregate Tailings Delivered Gray Rather Than White
null
Coloured Render Did Not Adhere To Roof Deck Rim
null
Coloured Render Did Not Adhere To Roof Deck Rim
null
Expansive Foam To Stop Bats Under Water Tank Room Roof
null
A Void A Non Structural Beam To Support Electricity Conduits
null
null
Jack Hammering Out A Non Structural Beam To Support Electricity Conduits
null
Gypsum To Adhering To Ceiling
null
Wondering How To Use One Fully Laden Aggregate Lorry To Pull Another Out Of The Mud
null
Digging A Fully Laden Aggregate Lorry Out Of The Mud
null
Drilled Through To The Hot Water Pipe
null
Repairing The Hot Water Pipe
null
Rendering The Roof Garden Plant Pots That Were Not Fired Hot Enough
null
Roof Garden Plant Pots Rendered With Glue Cement
null null null null null null null null null null
null
  Ping View  
null
Large Luxury Serviced Apartments
Centrally Located - Facing The River
null
199 Padet Road, Moo 3, Padet Nua,
Chiang Mai 50100
null
184504.38N 995914.66E
null
telephone 08 4406 0980 / 053 447 224 / 053 447 225

Copyright © D & M 2007 - 2018